During some periods of the Space Shuttle Program, post-flight reconstruction and performance assessment were reduced as a cost saving measure. This reduction in the scope and detail of post-flight reconstruction and performance assessment precluded the detection of inaccuracies in the definition of induced environments for the design of the Space Shuttle vehicle.
Related Topics
Risk Management for Quality Assurance